Projects

Aquatic and Leisure Centre Parramatta - Precast Installation

The team at RMK Rigging and RMK Cranes proudly completed the precast installation on this project. The installation was comprised of over three hundred precast items. Precast bleachers line the main pool area, behind these in a spherical form we installed coloured edge panels which frame the surrounding gardens and pool facility. RMK also installed the top façade walls to the internal sphere form of the building and inset from these inside the building we installed architectural load bearing walls, externally to the building and finalising the precast installation facet of the project we installed precast seating to landscaping areas.

Project Gallery